Recent comments

Breaking News

ARCA South Integrated transport terminal primed as gateway to Metro


The South Integrated Transport System (ITS), a multi-modal terminal placed in a very five-hectare ton inside the FTI compound in Taguig, are designed right beside Ayala Land's (ALI) newest business and life-style district, ARCA South. The South ITS can facilitate organized transfers of some four,000 buses and 160,000 passengers expected to meet up with the terminal daily.

The Department of Transportation and Communication (DOTC) and Arca South Integrated Terminal, Inc., a totally in hand Ayala Land company, have recently inked a 35-year concession agreement to make and operate the South ITS. Construction can begin later this year and also the project is predicted to be completed by 2018.

ARCA South can have an estate management system in place for transport, traffic, estate security and watching. the event can have inexperienced areas, pedestrian walkways and bicycle lanes to assist unencumber the roads.

"It are a contributing atmosphere for folks to measure, work, or visit, with all its conveniences and strategic access and links. The estate management systems can facilitate guarantee of efficiencies just like different premier lifestyle and business destinations," same Sir Leslie Stephen Comia, ALI Project Development Manager.

"With the Skyway/C5-C6 connecter road plans afoot, and an ardent ramp which will link motorists and PUVs to the ITS terminal and genus Arca South, the event may be a budding landmark of convenience and potency," he all over.

No comments